AlphaNDT's been awarded to carry NDT for technological piping system fabrication& installation. Contractor for this package is PTSC Quang Ngai and the Main Contractor is Technip
RT, UT and MPI testing performance for the installation of main intake pipeline and gates.
Conduct the NDT service including UT, RT for the installation of water injection flowline, phase No 02 on N1 Desk, Randong Oil Field of JVPC. Amount of work: 8,500 USD
Implementation of NDT for risk assessment on the existing acid pipeline and tank. Method to be used here is the ultrasonic thickness gauge in accordance with ALPHA NDT's procedure
Alpha NDT conducted the NDT for the newly building 6,500 tones bulk carrier, built by Halong shipyard. This is one of the biggest-to-this moment vessel ever built by local shipyard. Work volume was up
FUJI Film: 10.000 sheets, MPI and DPI materials: 1000 cans and others