AlphaNDT have executed NDT services for comissioning and hook-up of Chim Sao and Topaz Platforms due to contract signed with PTSC Offshore Services. The work includes RT, UT, PT, MT for structures of
Since 08/2010, AlphaNDT have deployed NDT service provision for RBI (Risk Base Inspection) task for pipeline at Dung Quat Refinery due to requirement of PMC.
AlphaNDT provide RT, MT, UT, PT, UTM, HT services for the construction of 02 topsides Hai Thach 1 WHP: 2.150 MT; PQP-Hai Thach topside: 13.200 MT and 01 jacket PQP-Hai Thach: 16.200 MT.
In this project, AlphaNDT has provided RT, UT, MT, PT for the structures of leg structure, cantilever, drill floor, jackcase of the rig. The work is scheduled to finish at the end of year 2011.
On March 2010, AlphaNDT supply NDT for Hook-up and Comissioning of WHP-B Topside at Block 15-1 offshore Ba Ria - Vung Tau.
QIS-ALPHANDT Consortium provide RT, UT, MT, PT services for the whole fabrication of jacket, topside, helideck, piping, pile, boatlanding, flare boom.