NDT FOR PIPELINE FABRICATION OF HSTD FIELD DEVELOPMENT PROJECT
edf40wrjww2DTV_News:Content_EN
Since September 2012, AlphaNDT have been executing NDT (RT using X-ray machine, MT, UT, PT) for onshore fabrication of 16”,8”,6”pipeline system which is a part of Hai Su Trang– Hai Su Den Development project which to construct two topsides and two jackets with total weight of 5,000MT. The construction is owned by Thang Long JOC, fabricated by PTSC M&C and pipeline fabrication is awarded to Saipem.
OTHER PROJECTS