BUNGA TULIP-A DEVELOPMENT PROJECT owned by Talisman Malaysia Energy Limited (TML) had successfully completed. After launching the platform sub-structure weighted approximately 920 tonnes on
- Magnetic testing
- 6,592.2 mét
- Ultrasonic testing
- UT for weld 2,441.5 mét
- UT lamination 295.8 mét
- Penetrant testing
- PT for long weld 340.9 mét
- PT for Joint: 1,350 Joints
- Radiographic testing
- Film size 10x20: 5,346 films
- Film size 10x40: 551 films